News
Preparations for SSFDR integration
30.06.2010
Vyborg Shipyard together with the Korean and Dutch subcontractors started preparations for a unique float over operation on integration of topside and lower hull of the “Polar Star” SSFDR.
Lower hull of the “Polar Star” SSFDR is delivered to South Korea
20.06.2010
On 20th June lower hull of the “Polar Star” SSFDR arrived at SHI yard in South Korea.
The annual meeting of shareholders of Vyborg Shipyard JSC was held at the premises of Vyborg Shipyard
10.06.2010
On June 9, 2010 the annual meeting of shareholders of Vyborg Shipyard JSC was held at the premises of Vyborg Shipyard.