News
Preparations for SSFDR integration
Vyborg Shipyard together with the Korean and Dutch subcontractors started preparations for a unique float over operation on integration of topside and lower hull of the “Polar Star” SSFDR.
On 30th June SSFDR topside was loaded out on board HTV vessel for transportation to the integration site. Lower hull of SSFDR built at Vyborg Shipyard is already at the site of the float over operation which start is planned for 5th July.